Airbus’s re-engined A330neo has passed its detailed design review, some six months after concept freeze.
The airframer embarked on detailed component design work for the Rolls-Royce Trent 7000-powered twinjet around mid-2015.
Airbus disclosed during the Singapore air show that the aircraft had “successfully passed” the detailed design review in December, a few weeks after manufacturing of the first parts had begun.
“With this achievement all critical design and industrial reviews at component level have been passed,” it says.
“Required performance and time-to-market planning have been fully demonstrated.”
Airbus says manufacturing of components for the aircraft is “well advanced”, with initial assemblies being produced at facilities including St Eloi – which specialises in the pylon – as well as Nantes and Broughton.
Final assembly of the A330neo is set to begin in the fourth quarter of this year. Airbus is aiming to deliver the aircraft within a 42-month development schedule, with first handover to customers in late 2017.
Airbus has secured orders for 170 of the re-engined jets of which all but 10 are for the larger -900 variant.
Archived
10 years ago
The acquisition marks an important step in SITA’s evolution from a provider of aviation connectivity solutions to a driver of smarter operational decision-making. By combining Flightscape’...
Archer Aviation Inc. and ITA Airways, Italy’s national carrier and a member of the Lufthansa Group, have entered into a strategic partnership to advance the deployment of an all-e...
Boston MedFlight, the internationally recognized nonprofit provider of critical care transport services, has signed an agreement with Airbus Helicopters for three new H145 helicopt...
HALO-Flight is set to further expand its South Texas air medical capabilities following the order of an additional Bell 407GXi announced by Bell Textron at AMTC 2026. The new aircraft will bring the o...