Bell Helicopter has confirmed one of its two 525 Relentless prototypes crashed while conducting developmental flight test operations, fatally injuring two of its flight test crew.
The bright orange panted 525, Bell’s first Relentless prototype to fly, N525TA, came down in a field south-east of the manufacturer’s Arlington, Texas, Xworks facility in Ellis County before midday local time on July 6 (about 0545 AEST July 7) and was destroyed by fire.
Bell Helicopter had just celebrated one year of 525 flight testing after N525TA made its first flight on July 3, 2015.
Imagery from the crash site shows some of the 525’s main rotor blades along with the helicopter’s severed tail boom located around 400 metres away from the main burnt out wreckage.
“Unfortunately, the accident resulted in a loss of two crew members,” reads Bell Helicopters’ statement.
“We are deeply saddened by the loss of our teammates and have reached out to their families to offer our support. Bell Helicopter representatives are onsite to assess the situation and provide any assistance to local, state, and federal authorities.”
The 525 Relentless test program has completed more than 130 flight test hours with a third prototype about to join the program in an effort for Bell to achieve certification of the type in late 2017.
From the forests of Canada and the Pacific Northwest to the fire-prone landscapes of Florida, Daher Aircraft’s Kodiak and TBM platforms are playing an increasingly critical role in wildfire resp...
Archer Aviation Inc. and ITA Airways, Italy’s national carrier and a member of the Lufthansa Group, have entered into a strategic partnership to advance the deployment of an all-e...
Embraer has appointed FL Technics as an Embraer Authorized Service Center (EASC) for its commercial aircraft fleet in Lithuania. The designation covers the E170 and E190 aircraft, further strengt...
As demand for seamless onboard connectivity continues to grow, aircraft owners and operators are placing increasing emphasis on selecting connectivity solutions that align with their operational needs...