50 SKY SHADES - World aviation news

CFM claims 50-second start-up time for A320neo engine

Download: Printable PDF Date: 05 Feb 2016 20:46 (UTC) category:
Publisher:
CFM claims 50-second start-up time for A320neo engine - Manufacturer publisher
Dana Ermolenko
Aircraft: Airplanes
Source: Flightglobal

Start-up times are not a problem for the Leap-1A engine nearing entry into service in mid-2016 for the Airbus A320neo, manufacturer CFM International says.

Each of the two Leap-1A engines installed on an A320neo need 50s to spool-up after the activation sequence is started, says CFM executive vice-president Allen Paxson, speaking on a teleconference with journalists on 5 February.

That timing comes within “a handful of seconds” of the CFM56 engine that the Leap-1A replaces on the A320 family, he adds.

It also appears to contrast with the start-up time requirement for the first batch of Pratt & Whitney PW1100G engines, CFM’s rival for orders on the A320neo.

In December, Airbus delayed entry into service of the A320neo by one month after original launch customer Qatar Airways objected to the start-up time requirement for the PW1100G engine. Lufthansa accepted the first A320neo and launched service in late-January.

Meanwhile, P&W parent United Technologies has said the excess start-up timing requirement on early engines is needed to prevent components in the engine from over-heating.

A hardware and software upgrade is expected to be ready this month PW1100Gs now in final assembly. Those engines will likely begin entering service on delivered A320neos beginning early in the second quarter.

CFM officials are keen to distance the upcoming Leap-1A from such concerns. Their engine is scheduled to enter service on the A320neo in mid-2016.

The Leap-1A engine was designed in a way that minimises the start-up time requirement, says CFM executive vice-president Francois Bastin. Key electronics are located near the front of the engine close to the fan, which means they are installed in a “cooler environment”, he says.

“That's taken into account in the very early stages of the design,” he adds.

CFM remains on track to deliver the first production version of the Leap-1A soon to Airbus for installation on a production A320neo. Test cell data has confirmed the engine meets Airbus and customer specifications, Bastin says.

The Leap-1B engine for the Boeing 737 Max 8 cleared a major milestone on 29 January with the first flight of the initial test aircraft. That engine remains “projected to be on spec” by the 737 Max 8’s scheduled entry into service in 2017, Bastin says.

CFM also has delivered the first two Leap-1C engines to Comac, which were shown installed on the C919 during a roll-out event in November. Those engines are ready to fly when Comac is ready. The C919 is scheduled to begin flight tests in 2016.





Recommended

Qantas Group strengthens regional network with strategic turboprop fleet investment

  Qantas has announced a major investment in its De Havilland Dash 8 turboprop fleet, reinforcing its long-term commitment to maintaining reliable air links across regional Australia. As part...

De Havilland Canada expands Canadair 515 production following strategic agreement

De Havilland Canada has announced a landmark agreement with the Government of Canada and Export Development Canada (EDC) that will enable the manufacturer to significantly expand p...

Airbus and Air France-KLM finalize joint venture for A350 component support

Airbus has launched Alpha Component Solutions, a 50:50 joint venture with Air France dedicated to delivering comprehensive A350 component support services. Jointly operated by Airbus and Air Fran...

Archer and ITA Airways drive forward vision for sustainable air taxi travel in Italy

Archer Aviation Inc. and ITA Airways, Italy’s national carrier and a member of the Lufthansa Group, have entered into a strategic partnership to advance the deployment of an all-e...

Android Apps development in Riga, Latvia